Item request has been placed! ×
Item request cannot be made. ×
loading  Processing Request
Item request has been placed! ×
Item request cannot be made. ×
loading  Processing Request
Academic Journal

Review and classification of constructive heuristics mechanisms for no-wait flow shop problem.

  • Source: International Journal of Advanced Manufacturing Technology. Sep2016, Vol. 86 Issue 5-8, p2161-2174. 14p. 1 Diagram, 8 Charts.

تفاصيل العنوان

×
Academic Journal

Evaluation of high performance constructive heuristics for the flow shop with makespan minimization.

  • Source: International Journal of Advanced Manufacturing Technology. Oct2016, Vol. 87 Issue 1-4, p125-136. 12p. 1 Diagram, 8 Charts, 2 Graphs.

تفاصيل العنوان

×
Academic Journal

Effective heuristics for the no-wait flow shop scheduling problem with total flow time minimization.

  • Source: International Journal of Advanced Manufacturing Technology. Jun2013, Vol. 66 Issue 9-12, p1563-1572. 10p. 8 Charts, 2 Graphs.

تفاصيل العنوان

×
Academic Journal

Heuristics to minimize makespan of parallel batch processing machines.

  • Source: International Journal of Advanced Manufacturing Technology. Jul2008, Vol. 37 Issue 9-10, p1005-1013. 9p. 4 Diagrams, 5 Charts.

تفاصيل العنوان

×
Academic Journal

Two meta-heuristics for a multi-period minisum location-relocation problem with line restriction.

  • Source: International Journal of Advanced Manufacturing Technology. Mar2014, Vol. 71 Issue 5-8, p1033-1048. 16p. 7 Charts, 5 Graphs.

تفاصيل العنوان

×
Academic Journal

Heuristics for makespan minimization on parallel batch processing machines with unequal job ready times.

  • Source: International Journal of Advanced Manufacturing Technology. Aug2010, Vol. 49 Issue 9-12, p1119-1128. 10p. 5 Diagrams, 6 Charts, 4 Graphs.

تفاصيل العنوان

×
  • 1-10 ل  551 نتائج ل ""Heuristics""