Optimal replacement policy for a two-component cold standby system with repair priority

Item request has been placed! ×
Item request cannot be made. ×
loading   Processing Request
  • معلومة اضافية
    • بيانات النشر:
      SAGE Publications, 2010.
    • الموضوع:
      2010
    • نبذة مختصرة :
      In this paper, a cold standby repairable system consisting of two dissimilar components and one repairman is examined. It was assumed that both Component 1 and Component 2, were not as good as new after repair, and Component 1 had repair priority. Under these assumptions, using the geometric process repair model, a discrete replacement policy N under which the system is replaced when the number of failures of Component 1 reaches N is considered. The problem was to determine an optimal policy N∗ so that the long-run average loss per unit time L( N) of the system was minimized. The expression L( N) was explicitly derived, and the corresponding optimal policy N∗ can be determined by minimizing L( N) with respect to N. A numerical example and the associated MATLAB computer program are given to illustrate the model—s applicability. Finally, conclusions are drawn for this study.
    • ISSN:
      2041-2975
      0954-4054
    • Rights:
      CLOSED
    • الرقم المعرف:
      edsair.doi...........5f2ddce653b7df83da616446bb490756