Item request has been placed! ×
Item request cannot be made. ×
loading  Processing Request

Rail vehicle and method for surveying a track section

Item request has been placed! ×
Item request cannot be made. ×
loading   Processing Request
  • Publication Date:
    February 27, 2024
  • معلومة اضافية
    • Patent Number:
      11912,317
    • Appl. No:
      16/966555
    • Application Filed:
      January 02, 2019
    • نبذة مختصرة :
      A rail vehicle has a vehicle frame which, supported on on-track undercarriages, is mobile on the rails of a track. The rail vehicle includes a first measuring platform with a first inertial measuring system for recording a track course. A second measuring platform is arranged on the rail vehicle, with a second inertial measuring system and at least one sensor device for recording surface points of a track section. The second measuring platform and the second inertial measuring system enable the movement of the sensor device in the three-dimensional space to be recorded in a simple manner.
    • Inventors:
      PLASSER & THEURER EXPORT VON BAHNBAUMASCHINEN GMBH (Vienna, AT)
    • Assignees:
      Plasser & Theurer Export von Bahnbaumaschinen Gesellschaft m.b.H. (Vienna, AT)
    • Claim:
      1. A rail vehicle, comprising: a vehicle frame supported on on-track undercarriages for mobility on rails of a track; a first measuring platform mounted on the rail vehicle, said first measuring platform having a first inertial measuring system for recording a track course and a first spatial curve; a second measuring platform mounted on the rail vehicle, said second measuring platform having a second inertial measuring system for recording a second spatial curve and at least one sensor device for recording surface points of a track section of the track; and a movement of said at least one sensor device in three-dimensional space being recorded by said second inertial measuring system.
    • Claim:
      2. The rail vehicle according to claim 1 , further comprising a computer configured to receive measurement data of said first and second inertial measuring systems and of said sensor device and configured for a transformation of coordinates of the surface points from a coordinate system followed by said sensor device of said second measuring platform into a coordinate system, following the track course, of the first measuring platform.
    • Claim:
      3. The rail vehicle according to claim 2 , further comprising an evaluation device arranged on the rail vehicle, said evaluation device being designed for comparison of the coordinates of the surface points in the coordinate system of the first measuring platform to a prescribed clearance profile of the track section.
    • Claim:
      4. The rail vehicle according to claim 1 , wherein said first measuring platform is mounted on one of said on-track undercarriages.
    • Claim:
      5. The rail vehicle according to claim 4 , wherein said first measuring platform comprises a measuring frame arranged on wheel axles of said on-track undercarriage and having said first inertial measuring system mounted thereon.
    • Claim:
      6. The rail vehicle according to claim 5 , further comprising at least two position measuring devices for determining a position of said measuring frame relative to the rails of the track mounted to said measuring frame.
    • Claim:
      7. The rail vehicle according to claim 1 , wherein said second measuring platform is arranged at a front side of the rail vehicle.
    • Claim:
      8. The rail vehicle according to claim 1 , wherein said sensor device comprises a laser scanner for recording the surface points as a point cloud.
    • Claim:
      9. A method for surveying a track section, the method comprising: providing a rail vehicle according to claim 1 ; recording a track course by way of the first inertial measuring system; recording a course of motion of the at least one sensor device in three-dimensional space by way of the second inertial measuring system; recording surface points of the track section by way of the sensor device; and calculating survey information regarding the track section from data recorded with regard to the track course, the course of motion, and the surface points.
    • Claim:
      10. The method according to claim 9 , wherein: the step of recording the track course comprises recording a course of motion of a coordinate system of the first measuring platform; the step of recording the course of motion of the sensor device comprises recording a course of motion of a coordinate system of the second measuring platform.
    • Claim:
      11. The method according to claim 9 , which comprises transforming coordinates of the surface points from a coordinate system moving along with the sensor device of the second measuring platform into a coordinate system, following the track course, of the first measuring platform.
    • Claim:
      12. The method according to claim 11 , which comprises comparing the coordinates of the surface points in the coordinate system of the first measuring platform with a clearance profile of the track section.
    • Claim:
      13. The method according to claim 12 , which comprises calculating a displaying a clearance profile transgression of a surface point on an output device.
    • Patent References Cited:
      4179216 December 1979 Theurer et al.
      4654973 April 1987 Worthy
      5113767 May 1992 Theurer
      5199176 April 1993 Theurer
      5893043 April 1999 Moehlenbrink et al.
      6415522 July 2002 Ganz
      7979995 July 2011 Theurer et al.
      9810533 November 2017 Fosburgh
      10459001 October 2019 Foerster
      10589763 March 2020 Buerger
      11014587 May 2021 Corbin
      11169269 November 2021 Mesher
      11377130 July 2022 Mesher
      20040122569 June 2004 Bidaud
      20090070064 March 2009 Farritor et al.
      20100004804 January 2010 Anderson et al.
      20170066459 March 2017 Singh
      20190136462 May 2019 Buerger et al.
      20200361502 November 2020 Metzger
      101765689 June 2010
      102756744 October 2012
      203020332 June 2013
      107097807 August 2017
      19532104 January 1997
      102008062143 May 2010
      102013210361 December 2014
      1361136 November 2003
      2403861 January 2005
      S53149058 December 1978
      2012208043 October 2012
      20100068595 June 2010
      2017215777 December 2017
    • Other References:
      Oberlechner et al.: “POS/TG—Innovation auf dem Gebiet der Gleisgeometriemessungen” [Innovation in track geometry measurement], El—Eisenbahningenieur (52), Sep. 2001 pp. 6-9—English Summary on p. 9. cited by applicant
    • Primary Examiner:
      Guadalupe-Mccall, Yaritza
    • Attorney, Agent or Firm:
      Greenberg, Laurence A.
      Stemer, Werner H.
      Locher, Ralph E.
    • الرقم المعرف:
      edspgr.11912317