An Estimation of the Safety Risk Factors Encountered During Tower Crane Installation and Dismantling on Construction Sites in Vietnam

Item request has been placed! ×
Item request cannot be made. ×
loading   Processing Request
  • المصدر:
    International Journal of Sustainable Construction Engineering and Technology; Vol. 14 No. 1 (2023); 337-345; 2600-7959; 2180-3242
  • نوع التسجيلة:
    Electronic Resource
  • الدخول الالكتروني :
    http://penerbit.uthm.edu.my/ojs/index.php/IJSCET/article/view/12762
    http://penerbit.uthm.edu.my/ojs/index.php/IJSCET/article/view/12762/5615
    http://penerbit.uthm.edu.my/ojs/index.php/IJSCET/article/view/12762/5615
  • معلومة اضافية
    • Publisher Information:
      Penerbit UTHM 2023-02-14
    • Added Details:
      Ngo , Thanh Long
    • نبذة مختصرة :
      The construction field has an important and meaningful role in the economy of any nation, especially developing nations. However, construction is one of the most dangerous fields and has the highest rate of accidents, including deaths and disabling injuries in the world. The construction field uses many tower cranes, especiallyfor constructing multi-storey buildings, factories, or in urban areas, and requires an increasing number of tower cranes. Tower cranes certainly contribute to the high rate of construction injuries and fatalities, in which tower crane installation and dismantling take a high rate. Accidents during tower crane installation and dismantling can kill people (workers and citizens) as well as delays in construction schedules of project and/or damage to buildings and machines under construction. As a result, the cost of costruction projects can increase. In this paper, safety risk factors during tower crane installation and dismantling on construction sites in Vietnam are estimated by showing their likelihood of occurrence, degree of influence, and risk levels. A suitable-structured questionnaire was produced and sent to get data that had their likelihood of occurrence and degree of influence by applying a five-point Likert scale. The results showed that “Time constraints are requested by investor, principal contractor or employer” is the most likely factor with a mean value of 3.60 and “Break of a wire rope occurring on dismantling” has the highest degree of influence, with a mean value of 4.18. The result also showed that there are 15/21 factors with a moderate risk level that is acceptable but, requires suitable controls to maintain a safe working condition of tower crane installation and dismantling. The results of the paper may help managers as well as practicians with good understandings of how to advance the safety of tower crane installation and dismantling on construction sites in Vietnam.
    • الموضوع:
    • Note:
      application/pdf
      English
    • Other Numbers:
      MYUTH oai:publisher.uthm.edu.my:article/12762
      1370353147
    • Contributing Source:
      UNIVERSITI TUN HUSSEIN ONN MALAYSIA
      From OAIster®, provided by the OCLC Cooperative.
    • الرقم المعرف:
      edsoai.on1370353147
HoldingsOnline