Item request has been placed!
×
Item request cannot be made.
×

Processing Request
Operating performance of full-scale agricultural biogas plants in Germany and China : results of a year-round monitoring program
Item request has been placed!
×
Item request cannot be made.
×

Processing Request
- المؤلفون: Zhou, Lijun; Hülsemann, Benedikt; Cui, Zhiyang; Merkle, Wolfgang; Sponagel, Christian; Zhou, Yuguang; Guo, Jianbin; Dong, Renjie; Müller, Joachim; Oechsner, Hans
- نوع التسجيلة:
Electronic Resource
- الدخول الالكتروني :
https://doi.org/10.3390/app11031271
Applied Sciences
- معلومة اضافية
- Publisher Information:
MDPI 2021-02-04T08:40:03Z 2021-02-04T08:40:03Z 2021
- نبذة مختصرة :
Germany (DE) and China (CN) have different political approaches in supporting the biogas sector. Three German and three Chinese large-scale biogas plants (BGPs) were evaluated as part of a year-round monitoring program. Laboratory methods were utilized to analyze the chemical indicators. Results showed a stable anaerobic digestion process without system failures in all BGPs. The methane yield had a range of 0.23–0.35 m3 CH4/kgODM for DE BGPs and 0.11–0.22 m3 CH4/kgODM for CN BGPs, due to different substrates and working temperatures. Financial analyses indicated that DE BGPs are viable under their current feed-in tariffs contracts. Their financial internal rate of return (IRR) ranged between 8 and 22%. However, all CN BGPs had negative IRRs, indicating that they are financially unfeasible. Risk analyses illustrated that DE BGPs will face financial nonviability if benefits decrease by 9–33% or costs increase by 10–49%, or if a combined worse case (benefit decrease and cost increase) of 5 20% occurs. Incentives to BGP operations are particularly important in China, where the government should consider switching the construction-based subsidy to a performancebased subsidy system to motivate the operators. BGP monitoring is necessary to understand the performance, in addition to briefing policymakers in case a policy reform is needed
- الموضوع:
- Availability:
Open access content. Open access content
http://creativecommons.org/licenses/by/4.0
- Note:
application/pdf
Applied Sciences
English
- Other Numbers:
CHZHA oai:digitalcollection.zhaw.ch:11475/21517
https://doi.org/10.3390/app11031271
https://doi.org/10.21256/zhaw-21517
info:doi/10.3390/app11031271
info:doi/10.21256/zhaw-21517
https://hdl.handle.net/11475/21517
https://digitalcollection.zhaw.ch/handle/11475/21517
info:hdl/11475/21517
urn:issn:2076-3417
1285669835
- Contributing Source:
ZHAW UNIV LIBR
From OAIster®, provided by the OCLC Cooperative.
- الرقم المعرف:
edsoai.on1285669835
HoldingsOnline
No Comments.