Item request has been placed! ×
Item request cannot be made. ×
loading  Processing Request

BIM can help decarbonize the construction sector: Primary life cycle evidence from pavement management systems

Item request has been placed! ×
Item request cannot be made. ×
loading   Processing Request
  • معلومة اضافية
    • Contributors:
      CIRAIG; École Polytechnique de Montréal (EPM); Laboratoire Ville, Mobilité, Transport (LVMT); École des Ponts ParisTech (ENPC)-Université Gustave Eiffel; Roberval (Roberval); Université de Technologie de Compiègne (UTC); EUROVIA
    • بيانات النشر:
      HAL CCSD
      Elsevier
    • الموضوع:
      2023
    • Collection:
      Université de Technologie de Compiègne: HAL
    • نبذة مختصرة :
      International audience ; Transforming the construction sector is key to reaching net-zero, and many stakeholders expect its decarbonization through digitalization, but no quantified evidence has been brought to date. This article proposes the first environmental quantification of the impact of Building Information Modeling (BIM) in the construction sector. Specifically, the direct and indirect greenhouse gas (GHG) emissions generated by a monofunctional BIM to plan road maintenance – a Pavement Management System (PMS) - are evaluated using field data from France. The related carbon footprints are calculated following a life cycle approach, using different sources of data – including ecoinvent v3.6 – and the IPCC 2013 GWP 100a characterization factors. Three design-build-maintain pavement alternatives are compared: scenario 1 relates to a massive design and surface maintenance, scenario 2 to a progressive design and pre-planned structural maintenance, and scenario 3 to a progressive design and tailored structural maintenance supported by the PMS. First, results show the negligible direct emissions due to the PMS existence – 0.02% of the life cycle emissions of scenario 3's pavement, e.g. 0.52 t CO2eq for 10 km and 30 years. Second, the base case and two complementary sensitivity analyses show that the use of a PMS is climate-positive over the life cycle when pavement subgrade bearing capacity improves over time, neutral for the climate otherwise. The GHG emissions savings using BIM can reach up to 14 and 30% of the life cycle emissions respectively compared to scenario 2 and 1, and resp. 47 and 65% when restraining the scope to maintenance and rehabilitation and excluding original pavement construction. Third, the neutral effect of BIM in case of a deterioration of the bearing capacity of the subgrade may be explained by design practices and safety margins, that could in fact be enhanced using BIM. Fourth, the decarbonization potential of a multifunctional BIM is discussed, and research perspectives are presented.
    • الرقم المعرف:
      10.1016/j.jclepro.2023.136056
    • الدخول الالكتروني :
      https://hal.science/hal-04620683
      https://hal.science/hal-04620683v1/document
      https://hal.science/hal-04620683v1/file/PMS_CF_Manuscript_V14.pdf
      https://doi.org/10.1016/j.jclepro.2023.136056
    • Rights:
      info:eu-repo/semantics/OpenAccess
    • الرقم المعرف:
      edsbas.B015DB90