Item request has been placed! ×
Item request cannot be made. ×
loading  Processing Request

Perancangan Jadwal Maintenance untuk Menurunkan Downtime pada Line Mesin Pellet 9 dengan Metode Reliability Centered Maintenance (RCM)

Item request has been placed! ×
Item request cannot be made. ×
loading   Processing Request
  • معلومة اضافية
    • بيانات النشر:
      Jurnal Titra
    • الموضوع:
      2019
    • Collection:
      Publication of Petra Christian University
    • نبذة مختصرة :
      PT. X is a company engaged in the field of animal feed. The huge demand of animal feed causes machines work continuously and rarely stops. This condition can cause large machines downtime, especially for the pellet line. Downtime can be reduced by identifying the root cause by using Fault Tree Analysis. The cause of the problem will be given a value using Failure Mode Effect Analysis. FTA and FMEA are part of Reliability Centered Maintenance. Improvements were made by recapitulating failure data of the components to find out the effective days for conducting machines maintenance. The components maintenance day will be used to create a new maintenance schedule, which is expected to reduce the downtime. Downtime of main machine can be reduced by 31.94%.
    • File Description:
      application/pdf
    • Relation:
      https://publication.petra.ac.id/index.php/teknik-industri/article/view/8922/8048; https://publication.petra.ac.id/index.php/teknik-industri/article/view/8922
    • الدخول الالكتروني :
      https://publication.petra.ac.id/index.php/teknik-industri/article/view/8922
    • Rights:
      Copyright (c) 2019 Jurnal Titra
    • الرقم المعرف:
      edsbas.9DB7F14E