Item request has been placed! ×
Item request cannot be made. ×
loading  Processing Request

The fourth phase of the radiative transfer model intercomparison (RAMI) exercise: Actual canopy scenarios and conformity testing.

Item request has been placed! ×
Item request cannot be made. ×
loading   Processing Request
  • معلومة اضافية
    • بيانات النشر:
      ELSEVIER SCIENCE INC
    • الموضوع:
      2015
    • Collection:
      Joint Research Centre, European Commission: JRC Publications Repository
    • نبذة مختصرة :
      The RAdiative transfer Model Intercomparison (RAMI) activity focuses on the benchmarking of canopy radiative transfer (RT) models. For the current fourth phase of RAMI, six highly realistic virtual plant environments were constructed on the basis of intensive field data collected from (both deciduous and coniferous) forest stands as well as agricultural test sites in Europe and South Africa. Twelve RT modeling groups provided simulations of canopy scale (directional and hemispherically integrated) radiative quantities, as well as a series of binary hemispherical photographs acquired from different locations within the virtual canopies. The simulation results were found to be rather more dissimilar than those recently analysed for the “abstract canopy” scenarios of RAMI-IV. Canopy complexity is among the most likely drivers behind operator induced errors that gave rise to the discrepancies. To separate the simulation results into acceptable and non-acceptable contributions, conformity testing is introduced. More specifically, a shared risk approach is used to evaluate the compliance of RT model simulations on the basis of reference data generated with the weighted ensemble averaging technique from ISO-13528. However, using concepts from legal metrology, the uncertainty of this reference solution will be shown to prevent a confident assessment of model performance with respect to the selected tolerance intervals. As an alternative, guarded risk decision rules will be presented to account explicitly for the uncertainty associated with the reference and candidate methods. Both a guarded acceptance and a guarded rejection approach are used to make confident statements about the acceptance and/or rejection of RT model simulations with respect to the predefined tolerance intervals. ; JRC.H.5 - Land Resources Management
    • File Description:
      Online
    • Relation:
      JRC95251
    • الرقم المعرف:
      10.1016/j.rse.2015.08.016
    • الرقم المعرف:
      edsbas.4212CE1E