Production test IP-466-A test of the 190 turbine pumps at KE(KW) Rector (Project CGI-844)

Item request has been placed! ×
Item request cannot be made. ×
loading   Processing Request
  • معلومة اضافية
    • بيانات النشر:
      Office of Scientific and Technical Information (OSTI), 1962.
    • الموضوع:
      1962
    • نبذة مختصرة :
      The purpose of this test is to provide for adequate testing of the new steam turbine pumps. This will cover the tests required for the acceptance of these new items as per ATP-2588 and for any additional testing required to ensure reactor emergency cooling adequacy and reliability. A further objective is to provide the safety requiring by which the objectives of the ATP-2588 may be accomplished. A steam pump is being installed in each of the 190-K buildings to provide an additional secondary supply of reactor coolant. The basis for this test is presented in ATP-2588. Briefly, it is to authorize the required reactor down time and to assure reactor safety in the performance of the required testing procedures. These tests will develop the necessary and pertinent information concerning the cooling adequacy of this new system. At the same time, information will be obtained concerning the in situ characteristics of the steam turbine pump and the flow to the reactor when one side of the process lines is closed.
    • الرقم المعرف:
      10.2172/10176704
    • Rights:
      OPEN