Model for Quantifying the Impact of Change Orders on Project Cost for U.S. Roadwork Construction

Item request has been placed! ×
Item request cannot be made. ×
loading   Processing Request
  • معلومة اضافية
    • بيانات النشر:
      American Society of Civil Engineers (ASCE), 2010.
    • الموضوع:
      2010
    • نبذة مختصرة :
      Change orders are very common in almost every construction project nowadays, often resulting in increases of 5–10% in the contract price. Understanding the consequences of such trends, several studies have attempted to quantify the impact of change orders on the project cost. Most of the studies aimed at the quantification of the change orders were sponsored by contractors’ organizations, where statistical models used to quantify the impact of the change orders on the project cost were based on data supplied by the contractors; a situation that can lead to owner-contractor disagreements related to the quantification method used. In addition, most of the studies tackled commercial and electromechanical work, and very rare studies tackled the field of heavy construction; a field that suffers from change orders because of errors and omissions, scope of work changes, or changes because of unforeseen conditions. This study addresses the need for a statistical model to quantify the increase of the contract pric...
    • ISSN:
      1943-7862
      0733-9364
    • الرقم المعرف:
      edsair.doi...........23fdce36e2a931b5bde1769f7633c15c