Research on commissioning condition of natural gas processing plant. (English)
Item request has been placed!
×
Item request cannot be made.
×
![loading](/sites/all/modules/hf_eds/images/loading.gif)
Processing Request
- معلومة اضافية
- الموضوع:
- نبذة مختصرة :
The commissioning process of natural gas processing plant has the characteristics of high risk, high accident rate, and high technical content. Main stages of the natural gas processing plant commissioning process were concluded and summarized, and the main commissioning conditions of every stage were analyzed. Combining with the characteristics of commission condition during each stage, the applicability and characteristics of the establishment of commissioning network plan, safety work method and checking list method were described. At last, suggestions were given on evaluating commissioning condition of natural gas processing plant, which provided powerful technical support on successful commissioning of natural gas processing plant. [ABSTRACT FROM AUTHOR]
- نبذة مختصرة :
Copyright of Chemical Engineering of Oil & Gas / Shi You Yu Tian Ran Qi Hua Gong is the property of PetroChina Southwest Oil & Gas Field Company and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)