Item request has been placed! ×
Item request cannot be made. ×
loading  Processing Request

The costs of wind energy permitting compliance actions for regulated bats in the US.

Item request has been placed! ×
Item request cannot be made. ×
loading   Processing Request
  • المؤلفون: Newman C;Newman C; Surrey KC; Surrey KC
  • المصدر:
    PloS one [PLoS One] 2025 May 05; Vol. 20 (5), pp. e0322005. Date of Electronic Publication: 2025 May 05 (Print Publication: 2025).
  • نوع النشر :
    Journal Article
  • اللغة:
    English
  • معلومة اضافية
    • المصدر:
      Publisher: Public Library of Science Country of Publication: United States NLM ID: 101285081 Publication Model: eCollection Cited Medium: Internet ISSN: 1932-6203 (Electronic) Linking ISSN: 19326203 NLM ISO Abbreviation: PLoS One Subsets: MEDLINE
    • بيانات النشر:
      Original Publication: San Francisco, CA : Public Library of Science
    • الموضوع:
    • نبذة مختصرة :
      Competing Interests: The authors have declared that no competing interests exist.
      The wind industry's expansion in North America due to the need to provide clean energy is leading to increased regulatory concern for bats, particularly those that are endangered due to white-nose syndrome. The projected growth of installed wind capacity overlaps extensively with the ranges of several endangered and potentially regulated bat species. Wind energy operators in the US can comply with the Endangered Species Act (ESA) by submitting a Habitat Conservation Plan (HCP) and Incidental Take Permit (ITP) to the U.S. Fish and Wildlife Service. HCP documents include wind project overviews, estimates for incidental take (e.g., unavoidable fatalities), outline minimization and compensatory mitigation measures to avoid take, and often include estimated cost information for actions to implement the HCP/ITP. However, the lack of insight into specific cost data, combined with the lengthy ITP application process, has potentially led to the perception that ESA compliance imposes a costly regulatory burden on the private sector, deterring motivation for voluntary compliance. Resulting from the absence of routine reporting practices, it is not known how much it costs for companies to comply with ESA listings, nor is there a standardized database of compliance costs or a method for estimating them. This analysis of 25 publicly available project-specific HCPs published through 2022 establishes one approach to conceptualizing these costs and determined the median total cost for an HCP to be approximately $4.68 million (USD), with a notable discrepancy between the median costs for compensatory mitigation cost ($1.64 million) and fatality monitoring ($3.15 million). This analysis also created a general linear model that can be used to estimate potential project-specific costs, and overall provides better insight into the costs of complying with the ESA by identifying variables that might affect compliance costs, and estimating future costs for the wind industry.
      (Copyright: © 2025 Newman, Surrey. This is an open access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.)
    • References:
      Proc Natl Acad Sci U S A. 2016 Mar 22;113(12):E1593. (PMID: 26936948)
      Conserv Biol. 2021 Oct;35(5):1586-1597. (PMID: 33877716)
      Biol Conserv. 2017;215:241-245. (PMID: 31048934)
      Proc Natl Acad Sci U S A. 2016 Mar 22;113(12):E1594. (PMID: 26936956)
      PLoS One. 2020 Aug 28;15(8):e0238034. (PMID: 32857780)
      Bioscience. 2024 Apr 10;74(4):240-252. (PMID: 38720909)
      J Environ Manage. 2022 Apr 1;307:114577. (PMID: 35091240)
    • الموضوع:
      Date Created: 20250505 Date Completed: 20250505 Latest Revision: 20250518
    • الموضوع:
      20250519
    • الرقم المعرف:
      PMC12083899
    • الرقم المعرف:
      10.1371/journal.pone.0322005
    • الرقم المعرف:
      40324002