Item request has been placed! ×
Item request cannot be made. ×
loading  Processing Request

GM plans new $145M battery cell prototype center in Warren.

Item request has been placed! ×
Item request cannot be made. ×
loading   Processing Request
  • المؤلفون: Nagl, Kurt (AUTHOR)
  • المصدر:
    Crain's Detroit Business. 10/14/2024, Vol. 40 Issue 39, p2-2. 1p.
  • معلومة اضافية
    • الموضوع:
    • نبذة مختصرة :
      General Motors Co. is set to construct a $145 million battery cell prototype center at its Global Technical Center campus in Warren to accelerate electric vehicle battery cell development and lower costs. The Battery Cell Development Center is expected to begin production in 2027 and aims to bridge the gap between prototype and mass manufacturing as battery cell technology evolves rapidly. The facility, spanning 165,000 square feet, will focus on producing prototype EV batteries rather than mass production, with a peak capacity of 3,600 battery cells per year. The investment represents GM's continued expansion at its Tech Center, where the automaker has invested $2.5 billion over the past five years. [Extracted from the article]
    • نبذة مختصرة :
      Copyright of Crain's Detroit Business is the property of Crain Communications Inc. (MI) and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)